![]() |
價(jià) 格
更新時(shí)間
¥來(lái)電咨詢(xún)
2021-6-4
¥來(lái)電咨詢(xún)
¥來(lái)電咨詢(xún)
¥來(lái)電咨詢(xún)
uk gafloon pipe group ltd reminds you for water&electricity installation&water supply&drainage
·the thickness of external wall insulation chould be regarded when reserving holes for external wall rainwater pipe&air conditioning condensate pipe to avoid secondary hole repair.
·the elevation of indoor sewage pipe can be 5-10cm higher than the design elevation,ppr給水管材, as to avoid too small slope of outdoor drainage pipe network.
ppr管若裝在地下車(chē)庫(kù)
地下車(chē)庫(kù)的電氣預(yù)埋前結(jié)合風(fēng)管、管道圖紙,舟山ppr管材,避免燈具與風(fēng)管和管道重疊,造成后期燈具安裝時(shí)敷設(shè)明線(xiàn),增加造價(jià)及影響美觀(guān)。
車(chē)庫(kù)車(chē)庫(kù)內(nèi)有橋架,但過(guò)梁較大。局部橋架過(guò)梁時(shí)可采取梁中預(yù)埋鋼制套管(套管的直徑不宜過(guò)大),ppr管材批發(fā),這樣避免橋架從梁下上翻,影響車(chē)庫(kù)的凈高。
if ppr pipe is installed in underground garage
before the electrical pre burying of underground garage, the air duct&pipeline drawings shall be combined to avoid the overlapping of lamps with air duct&pipeline, resulting in the laying of open lines during the later installation of lamps, increasing the cost&affecting the appearance.
there is a bridge in the garage, but the lintel is large. the steel casing (the diameter of the casing should not be too large) can be embedded in the beam when the local bridge is over the beam, so as to prevent the bridge from turning up from under the beam&affecting the net ht= of the garage.
ppr管在電氣部分:
進(jìn)地下車(chē)庫(kù)的電纜保護(hù)管,套管必須出墻0.5m左右,便于后期電纜封堵及外墻防水。
提前準(zhǔn)備后期配套設(shè)施的規(guī)劃圖紙,ppr管材廠(chǎng)家,如供配電施工圖紙及室外管網(wǎng)圖。這樣可以縮短交房時(shí)間和節(jié)約成本。
地下車(chē)庫(kù)的電氣預(yù)埋前結(jié)合風(fēng)管、管道圖紙,避免燈具與風(fēng)管和管道重疊,造成后期燈具安裝時(shí)敷設(shè)明線(xiàn),增加造價(jià)及影響美觀(guān)。
ppr tube in the electrical part:
for the cable protection pipe entering the underground garage, the sleeve must be about 0.5m out of the wall, which is convenient for later cable plugging&external wall waterproof.
prepare the planning drawings of supporting facilities in advance, such as power supply&distribution building drawings&outdoor pipe network drawings. this can shorten the delivery time&save costs.
before the electrical pre burying of underground garage, the air duct&pipeline drawings shall be combined to avoid the overlapping of lamps with air duct&pipeline, resulting in the laying of open lines during the later installation of lamps, increasing the cost&affecting the appearance.
北京
上海
天津
重慶
河北
山西
內(nèi)蒙古
遼寧
吉林
黑龍江
江蘇
浙江
安徽
福建
江西
山東
河南
湖北
湖南
廣東
廣西
海南
四川
貴州
云南
西藏
陜西
甘肅
青海
寧夏
新疆
本站圖片和信息均為用戶(hù)自行發(fā)布,用戶(hù)上傳發(fā)布的圖片或文章如侵犯了您的合法權(quán)益,請(qǐng)與我們聯(lián)系,我們將及時(shí)處理,共同維護(hù)誠(chéng)信公平網(wǎng)絡(luò)環(huán)境!
ICP備案:滇ICP備13003982號(hào) 滇公網(wǎng)安備 53011202000392號(hào)
信息侵權(quán)/舉報(bào)/投訴處理
版權(quán)所有 ©100招商網(wǎng) 防騙須知 緩存時(shí)間:2025/8/2 9:38:44